[P2] V02: Verify adversarial authorization, runtime isolation and long-run memory stability #35
Labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#36 [P2] O03: Package the approved deployment and complete recovery and release evidence
primatekuntech/rag-rust
#22 [P1] I05: Propagate document revisions, deletion and revocation to every derived artifact
primatekuntech/rag-rust
#23 [P1] R02: Combine hybrid retrieval with canonical authorization before loading text
primatekuntech/rag-rust
#25 [P1] E02: Integrate the selected local runtime with verified session and KV-cache isolation
primatekuntech/rag-rust
#28 [P1] H03: Store protected answer feedback and authorized offline evaluation workflow
primatekuntech/rag-rust
#29 [P1] U02: Complete React streaming chat, authorized sources and feedback controls
primatekuntech/rag-rust
#30 [P1] O01: Enforce bounded admission, inference scheduling and request resource budgets
primatekuntech/rag-rust
#33 [P2] O02: Complete service-wide observability, protected diagnostics and operator alerts
primatekuntech/rag-rust
Reference
primatekuntech/rag-rust#35
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Backlog ID: V02 | Priority: P2 | Phase: M6 — Release evidence and approved deployment
Outcome and scope
Run system-level adversarial, concurrent sentinel and soak suites across every trust boundary, including real PostgreSQL/Qdrant and selected runtime.
Dependencies and gates
Engineering prerequisites: #22 (I05), #23 (R02), #29 (U02), #28 (H03), #25 (E02), #30 (O01), #33 (O02)
Synthetic-data development may proceed. Production use remains subject to the decision gates in the SRS.
Starting points
tests/security/; tests/soak/; docs/security/threat-model.md; docs/security/verification-results.md
These are current files or proposed responsibility boundaries; finalize a focused implementation plan before coding. Existing local scaffolding is uncommitted and is not evidence of completion.
Acceptance criteria
Verification
Retain reproducible threat-model traceability, test evidence and unresolved findings; independent security review signs off as required by the authority.
Behavior changes follow Red → Green → Refactor. Run affected Rust shared contract/unit tests and real PostgreSQL/Qdrant/runtime integration tests where applicable; frontend changes run typecheck/build and the relevant browser tests. Record exact commands/results in the implementation PR. Documentation/decision tasks use recorded review evidence.
Requirements and design
FR-PRIV-001–006; NFR-SEC-001, 004–005, NFR-PERF-005; SRS §8 criteria 2–4, 9, 15–16; architecture §14
Sources: SRS, system design. Local planning context:
docs/implementation-plan.mdanddocs/development-backlog.md(not published by this task).Security impact: Use synthetic fixtures until approved for operational data. Preserve current authorization, markings, provenance and default-deny behavior; exclude protected payloads/secrets from operational telemetry. No classified-deployment or PQC-compliance claim is implied by closing this issue.
Parent roadmap: #1