[P1] O01: Enforce bounded admission, inference scheduling and request resource budgets #30
Labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#27 [P1] H02: Deliver persisted streamed chat turns with cancellation and response-time authorization
primatekuntech/rag-rust
#33 [P2] O02: Complete service-wide observability, protected diagnostics and operator alerts
primatekuntech/rag-rust
#34 [P2] V01: Prove ten-user end-to-end TTFT and tune within the approved workload
primatekuntech/rag-rust
#35 [P2] V02: Verify adversarial authorization, runtime isolation and long-run memory stability
primatekuntech/rag-rust
#3 [P0] D02: Define the reproducible bilingual workload and TTFT benchmark envelope
primatekuntech/rag-rust
#10 [P0] F05: Enforce centralized authorization and bounded revocation across protected operations
primatekuntech/rag-rust
#12 [P0] F07: Replace startup-only readiness with dependency-aware health and safe telemetry
primatekuntech/rag-rust
#15 [P1] E01: Define bounded AI Engine contracts and shared adapter test suites
primatekuntech/rag-rust
Reference
primatekuntech/rag-rust#30
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Backlog ID: O01 | Priority: P1 | Phase: M5 — Local inference and complete chat
Outcome and scope
Implement application and Engine budgets for requests, per-user concurrency/rate, queue depth/wait, prompt/output tokens, timeout and cancellation; preserve interactive capacity alongside ingestion.
Dependencies and gates
Engineering prerequisites: #15 (E01), #10 (F05), #12 (F07), #3 (D02)
Final capacity values follow D02/E02 measurements; this task defines the controls without inventing final hardware sizing.
Starting points
crates/api/src/limits/; crates/ai-engine/src/scheduling/; crates/conversations/; tests/load/admission/
These are current files or proposed responsibility boundaries; finalize a focused implementation plan before coding. Existing local scaffolding is uncommitted and is not evidence of completion.
Acceptance criteria
Verification
Deterministic scheduler tests and ten-client overload tests verify fairness, bounds, cancellation cleanup and no starvation under ingestion load.
Behavior changes follow Red → Green → Refactor. Run affected Rust shared contract/unit tests and real PostgreSQL/Qdrant/runtime integration tests where applicable; frontend changes run typecheck/build and the relevant browser tests. Record exact commands/results in the implementation PR. Documentation/decision tasks use recorded review evidence.
Requirements and design
FR-RAG-008; NFR-PERF-002, 004–005; architecture §9.6
Sources: SRS, system design. Local planning context:
docs/implementation-plan.mdanddocs/development-backlog.md(not published by this task).Security impact: Use synthetic fixtures until approved for operational data. Preserve current authorization, markings, provenance and default-deny behavior; exclude protected payloads/secrets from operational telemetry. No classified-deployment or PQC-compliance claim is implied by closing this issue.
Parent roadmap: #1