[P2] O02: Complete service-wide observability, protected diagnostics and operator alerts #33
Labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#34 [P2] V01: Prove ten-user end-to-end TTFT and tune within the approved workload
primatekuntech/rag-rust
#35 [P2] V02: Verify adversarial authorization, runtime isolation and long-run memory stability
primatekuntech/rag-rust
#36 [P2] O03: Package the approved deployment and complete recovery and release evidence
primatekuntech/rag-rust
#12 [P0] F07: Replace startup-only readiness with dependency-aware health and safe telemetry
primatekuntech/rag-rust
#21 [P1] I04: Publish document versions atomically through a transactional indexing outbox
primatekuntech/rag-rust
#25 [P1] E02: Integrate the selected local runtime with verified session and KV-cache isolation
primatekuntech/rag-rust
#27 [P1] H02: Deliver persisted streamed chat turns with cancellation and response-time authorization
primatekuntech/rag-rust
#30 [P1] O01: Enforce bounded admission, inference scheduling and request resource budgets
primatekuntech/rag-rust
Reference
primatekuntech/rag-rust#33
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Backlog ID: O02 | Priority: P2 | Phase: M6 — Release evidence and approved deployment
Outcome and scope
Extend the initial telemetry to every service/adapter and deploy access-controlled dashboards, retention/rotation and actionable alerts distinct from the security audit trail.
Dependencies and gates
Engineering prerequisites: #12 (F07), #21 (I04), #25 (E02), #27 (H02), #30 (O01)
Synthetic-data development may proceed. Production use remains subject to the decision gates in the SRS.
Starting points
crates/api/; crates/ingestion/; crates/ai-engine/; deploy/observability/; docs/operations/runbooks/
These are current files or proposed responsibility boundaries; finalize a focused implementation plan before coding. Existing local scaffolding is uncommitted and is not evidence of completion.
Acceptance criteria
Verification
Inject each alert condition, verify delivery/runbook and access controls, and scan captured logs/traces/alerts for sentinel content or sensitive IDs.
Behavior changes follow Red → Green → Refactor. Run affected Rust shared contract/unit tests and real PostgreSQL/Qdrant/runtime integration tests where applicable; frontend changes run typecheck/build and the relevant browser tests. Record exact commands/results in the implementation PR. Documentation/decision tasks use recorded review evidence.
Requirements and design
FR-OPS-001–005; FR-ADMIN-002; NFR-OPS-001, 003; architecture §13
Sources: SRS, system design. Local planning context:
docs/implementation-plan.mdanddocs/development-backlog.md(not published by this task).Security impact: Use synthetic fixtures until approved for operational data. Preserve current authorization, markings, provenance and default-deny behavior; exclude protected payloads/secrets from operational telemetry. No classified-deployment or PQC-compliance claim is implied by closing this issue.
Parent roadmap: #1