[P0] F01: Complete the reproducible Rust/React baseline and CI checks #6
Labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
#7 [P0] F02: Complete typed security values and policy-owned authorization contracts
primatekuntech/rag-rust
#8 [P0] F03: Wire PostgreSQL migrations, bounded pooling and canonical repositories
primatekuntech/rag-rust
#12 [P0] F07: Replace startup-only readiness with dependency-aware health and safe telemetry
primatekuntech/rag-rust
Reference
primatekuntech/rag-rust#6
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Backlog ID: F01 | Priority: P0 | Phase: M1 — Secure build and persistence foundation
Outcome and scope
Review and complete existing untracked scaffolding rather than regenerating it. Pin supported toolchains and dependency locks, provide synthetic-only local PostgreSQL/Qdrant orchestration, and add CI.
Dependencies and gates
Engineering prerequisites: None — ready to start.
Synthetic-data development may proceed. Production use remains subject to the decision gates in the SRS.
Starting points
Cargo.toml; crates/api/; crates/domain/; crates/authorization/; web/; compose.yaml; README.md; .forgejo/workflows/
These are current files or proposed responsibility boundaries; finalize a focused implementation plan before coding. Existing local scaffolding is uncommitted and is not evidence of completion.
Acceptance criteria
Verification
Run the documented clean-checkout workflow and CI on the committed baseline. Verify no operational data or credentials are tracked.
Behavior changes follow Red → Green → Refactor. Run affected Rust shared contract/unit tests and real PostgreSQL/Qdrant/runtime integration tests where applicable; frontend changes run typecheck/build and the relevant browser tests. Record exact commands/results in the implementation PR. Documentation/decision tasks use recorded review evidence.
Requirements and design
NFR-MAINT-002–006; implementation plan increment A; architecture §§3, 5.2
Sources: SRS, system design. Local planning context:
docs/implementation-plan.mdanddocs/development-backlog.md(not published by this task).Security impact: Use synthetic fixtures until approved for operational data. Preserve current authorization, markings, provenance and default-deny behavior; exclude protected payloads/secrets from operational telemetry. No classified-deployment or PQC-compliance claim is implied by closing this issue.
Parent roadmap: #1
Implementation status
Implemented in draft PR #37 on
feat/6-repository-baseline-ci(head76bee40). All four acceptance criteria are verified. Both push CI and PR CI passed Rust and web jobs. Local checks, a clean committed checkout, and a clean Linux source/container build passed; 16 Rust tests are green. Independent review found no defects. This issue remains open pending review and merge.Started implementation on
feat/6-repository-baseline-ci. Existing baseline passes Rust formatting, Clippy, 16 tests and the frontend build. Scope: preserve/review scaffolding, pin toolchains and locks, add Forgejo CI, document clean-checkout checks, verify in a clean checkout/container. No repository or organization runners are registered; instance runner visibility is unavailable to this token, so hosted execution will be reported separately from local validation.