Backlog ID: K02 | Priority: P2 | Phase: M6 — Release evidence and approved deployment

Outcome and scope

Integrate approved ingress and internal transport profiles, identity/PKI signature paths and software/artifact signing using approved providers and real endpoint interoperability tests.

Dependencies and gates

Engineering prerequisites: #5 (K01), #2 (D01), #9 (F04), #25 (E02), #20 (R01)

Requires approved D01/K01 profile and chosen deployment peers. P2 means later release verification, not optional scope.

Starting points

deploy/; crates/crypto-config/; docs/security/transport-evidence.md; tests/security/crypto/

These are current files or proposed responsibility boundaries; finalize a focused implementation plan before coding. Existing local scaffolding is uncommitted and is not evidence of completion.

Acceptance criteria

  • Inventory every real browser/ingress/API/PostgreSQL/Qdrant/Engine/IdP peer and record pinned provider/module approval evidence.
  • Verify negotiated key-agreement group and certificate identity on actual peers; TLS 1.3 alone is not PQ proof.
  • Test supported browser fleet, hybrid/PQ negotiation where approved, downgrade/fallback policy, MTU/middlebox behavior and trust/revocation.
  • Exercise certificate/signing-key rotation, upgrade and rollback; reject unapproved fallback and do not implement custom combiners/protocols.

Verification

Retain reproducible handshake/identity/signature/rotation test evidence per link, with authority-reviewed gaps and permitted fallback behavior.

Behavior changes follow Red → Green → Refactor. Run affected Rust shared contract/unit tests and real PostgreSQL/Qdrant/runtime integration tests where applicable; frontend changes run typecheck/build and the relevant browser tests. Record exact commands/results in the implementation PR. Documentation/decision tasks use recorded review evidence.

Requirements and design

FR-CRYPTO-003–004, 006, 008–010; NFR-SEC-002–004; architecture §10.2

Sources: SRS, system design. Local planning context: docs/implementation-plan.md and docs/development-backlog.md (not published by this task).

Security impact: Use synthetic fixtures until approved for operational data. Preserve current authorization, markings, provenance and default-deny behavior; exclude protected payloads/secrets from operational telemetry. No classified-deployment or PQC-compliance claim is implied by closing this issue.

Parent roadmap: #1

**Backlog ID:** K02 | **Priority:** P2 | **Phase:** M6 — Release evidence and approved deployment ## Outcome and scope Integrate approved ingress and internal transport profiles, identity/PKI signature paths and software/artifact signing using approved providers and real endpoint interoperability tests. ## Dependencies and gates **Engineering prerequisites:** #5 (K01), #2 (D01), #9 (F04), #25 (E02), #20 (R01) Requires approved D01/K01 profile and chosen deployment peers. P2 means later release verification, not optional scope. ## Starting points deploy/; crates/crypto-config/; docs/security/transport-evidence.md; tests/security/crypto/ These are current files or proposed responsibility boundaries; finalize a focused implementation plan before coding. Existing local scaffolding is uncommitted and is not evidence of completion. ## Acceptance criteria - [ ] Inventory every real browser/ingress/API/PostgreSQL/Qdrant/Engine/IdP peer and record pinned provider/module approval evidence. - [ ] Verify negotiated key-agreement group and certificate identity on actual peers; TLS 1.3 alone is not PQ proof. - [ ] Test supported browser fleet, hybrid/PQ negotiation where approved, downgrade/fallback policy, MTU/middlebox behavior and trust/revocation. - [ ] Exercise certificate/signing-key rotation, upgrade and rollback; reject unapproved fallback and do not implement custom combiners/protocols. ## Verification Retain reproducible handshake/identity/signature/rotation test evidence per link, with authority-reviewed gaps and permitted fallback behavior. Behavior changes follow Red → Green → Refactor. Run affected Rust shared contract/unit tests and real PostgreSQL/Qdrant/runtime integration tests where applicable; frontend changes run typecheck/build and the relevant browser tests. Record exact commands/results in the implementation PR. Documentation/decision tasks use recorded review evidence. ## Requirements and design FR-CRYPTO-003–004, 006, 008–010; NFR-SEC-002–004; architecture §10.2 Sources: [SRS](https://forgejo.primatekun.tech/primatekuntech/rag-rust/src/branch/main/docs/SRS.md), [system design](https://forgejo.primatekun.tech/primatekuntech/rag-rust/src/branch/main/docs/architecture.md). Local planning context: `docs/implementation-plan.md` and `docs/development-backlog.md` (not published by this task). **Security impact:** Use synthetic fixtures until approved for operational data. Preserve current authorization, markings, provenance and default-deny behavior; exclude protected payloads/secrets from operational telemetry. No classified-deployment or PQC-compliance claim is implied by closing this issue. **Parent roadmap:** #1
Sign in to join this conversation.
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
primatekuntech/rag-rust#31
No description provided.